The exterior renovation of this 5 story brick structure included a new roof, windows and significant repair of leaking masonry. It was necessary to remove all the brick above the top row of windows, install new flashing and new brick.
Also involved was the construction of new accesability features including a new ramp, automatic entry systems and a new elevator which required raising the existing penthouse. An entry design of curved glass and galvanized steel finished the building off nicely.
The interior renovation, besides the constuction of all new elevator entrances, included updating of all mechanical and electrical / data systems. All office spaces were reconfigured, as well as all new bathrooms and finishes throughout.